Network Performance Testing Checklist Post-Antenna Installation
This checklist is designed to validate network performance after the installation of a high-gain antenna. It ensures that the boosted network connection meets required performance metrics for APN internet connectivity.
Checklist Items
Signal Strength Validation:
- – Use a signal testing device or app (e.g., LTE Discovery) to measure signal metrics (RSSI, RSRP, SINR).
- – Ensure the following thresholds are met:
Metric | Optimal Range | Description |
RSSI | Closer to -70 dBm or better | Indicates strong signal strength; higher values represent better quality. |
RSRP | Between -80 dBm and -100 dBm | Reflects the strength of the reference signal received by the device. |
SINR | 10 dB or higher | Measures signal-to-noise ratio; higher values indicate better signal quality relative to interference. |
Cable Connection Check:
- – Verify all coaxial cable connections are secure and properly waterproofed.
- – Inspect cables for any physical damage or wear.
Antenna Alignment Confirmation:
- – Ensure the antenna is aligned toward the nearest cell tower for optimal reception.
- – Fine-tune alignment using real-time signal metrics displayed on the testing device or app.
Router Configuration Validation:
- – Confirm the router is configured with the correct APN details.
- – Check that the router detects the antenna signal without interruptions.
Internet Speed Testing:
- – Conduct an internet speed test using online tools or apps.
- – Ensure download and upload speeds meet or exceed the expected benchmarks for the facility type.
Facility Type | Download Speed | Upload Speed |
Health Posts | 10 Mbps | 2 Mbps |
Medium Facilities | 50 Mbps | 10 Mbps |
High-Volume Facilities | 100 Mbps | 20 Mbps |
- – Verify that latency remains below 50 ms under optimal conditions.
Network Stability Testing:
- – Simulate peak usage scenarios to test stability and throughput.
- – Confirm that there are no significant fluctuations in signal strength or connection quality.
Monitoring Setup Verification:
- – Ensure all network devices are integrated into the monitoring system (e.g., Zabbix).
- – Verify SNMP and ICMP protocols are enabled for remote performance tracking.
Documentation and Handover:
- – Record the installation details, including signal metrics, speed test results, and alignment angles.
- – Take photos of the installed antenna for reference.
- – Provide basic troubleshooting training to the on-site support staff.